Monday, September 21, 2026
Home Industrial (English) Corporate India’s Nuclear Push Gains Momentum as NPCIL Starts Fuel Loading at RAPP-8

India’s Nuclear Push Gains Momentum as NPCIL Starts Fuel Loading at RAPP-8

RAPP-8 is the fourth reactor in a series of 16 indigenous 700 MWe PHWRs being developed across India

Advertisement

Rawatbhata, Rajasthan. IndustrialPunch: India’s nuclear power programme has reached another significant milestone with NPCIL’s 700 MWe RAPP-8 indigenous Pressurised Heavy Water Reactor (PHWR) at Rawatbhata commencing Initial Fuel Loading.

The milestone was achieved in compliance with applicable guidelines and regulatory requirements, further strengthening the standardisation of India’s 700 MWe PHWR design and supporting its deployment in fleet mode.

RAPP-8 is the fourth reactor in a series of 16 indigenous 700 MWe PHWRs being developed across India. It follows KAPS-3 and KAPS-4 at Kakrapar, Gujarat, and its twin unit RAPP-7, which commenced commercial operation in April 2025.

The development marks another step towards expanding India’s clean, reliable and energy-secure nuclear power capacity.

Advertisement
  • Join the IndustrialPunch WhatsApp Group:Click here
  • industrial punch is now on Whatsapp Channels. Click here to join
Advertisement
कोल इंडिया की 10 मेगा माइंस ने Q1 में बनाया रिकॉर्ड, SECL, NCL और MCL की खदानों का दबदबा भारत के सर्वाधिक कोयला भंडार वाले सात राज्यों के बारे में जानें: वित्तीय वर्ष 2025- 26 : कोल इंडिया लिमिटेड की टॉप- 10 खदान कोल इंडिया ने डिस्पैच का टारगेट भी किया कम, देखें 2026- 27 का कंपनीवार नया लक्ष्य कोल इंडिया ने घटाया लक्ष्य, देखें 2026- 27 का कंपनीवार नया टारगेट