Friday, March 13, 2026
Home Industrial (हिंदी) पॉवर NTPC Ltd sets up Agri-waste based 10 TPD Integrated Torrefaction and Pelletization...

NTPC Ltd sets up Agri-waste based 10 TPD Integrated Torrefaction and Pelletization Plant at NETRA

This opens a new avenue for NTPC Green Energy Limited, a wholly owned subsidiary of NTPC in the domain of renewable energy.

Advertisement

New Delhi, 30th October 2024: NETRA, the R&D wing of NTPC Ltd, and LWP Biocoal LLP, a Startup registered under GoI, have developed and setup a 10 TPD Integrated Torrefaction and Pelletization Plant for demonstration of indigenous technology and promotion of manufacturing of torrefied pellets in the country.

It may be mentioned that agricultural residue-based biomass co-firing, a carbon-neutral fuel, is recognized by the UNFCCC as a technology for reducing GHG emissions.

In May 2021, the Ministry of Power, Government of India, launched the ‘National Mission on Use of Biomass’ in Coal-Based Thermal Power Plants.

NTPC is already actively utilizing non-torrefied biomass for co-firing in pulverized coal (PC)-fired boilers. To date, a maximum of 10% by weight co-firing has been achieved using non-torrefied biomass pellets without any retrofitting.

Advertisement

However, to facilitate large-scale biomass usage, torrefaction and pelletization are essential, as torrefied biomass pellets offer higher energy density and properties closer to coal.

This opens a new avenue for NTPC Green Energy Limited, a wholly owned subsidiary of NTPC in the domain of renewable energy.

Advertisement
These are the top 5 most affordable diesel SUVs in the country, priced under Rs 10 lakh. Check out: कोल इंडिया लिमिटेड के 50 वर्ष : जानते हैं गठन की कहानी … क्या आप जानते हैं कोल इंडिया लिमिटेड (Coal India Limited) के शत प्रतिशत 100% अधिकार क्षेत्र में कितनी सहयोगी कंपनियां हैं, देखें : देश के 10 सबसे अमीर परिवारों और उनकी संपत्ति के बारे में जानें (वर्ष 2025) : जानें कोयला आधारित बिजली उत्पादन वाले टॉप 10 राज्य कौन से हैं …