Ranchi, 17 September : Today, on the auspicious occasion of Shri Shri Vishwakarma Puja, NTPC Coal Mining have entered into an Memorandum of Agreement (MOA) with Central Institute of Petrochemicals Engineering & Technology (CIPET) in a function held at Coal Mining Headquarters, Ranchi.

With this MOA, CIPET will provide job-oriented skill development training to the youths from the project affected families/ local villagers of NTPC’s Coal Mining Projects located in the States of Jharkhand, Odisha and Chhattisgarh.

Pravin Bachhav, Joint Director & Head, CIPET, Ranchi and KS Murthy, GM(HR), CMHQ have signed this MOA in the august presence of Partha Mazumder, RED(Coal Mining).

The skill development programme will be in the following 2 branches, consisting of 40 students in each batch, and will be of 6 months’ duration :

1) Machine Operator тАУ Plastic Processing
2) Machine Operator тАУ Injection Moulding

A total of 80 candidates from the Coal Mining project affected population shall be benefited from this initiative of Coal Mining Headquarters.

Follow on Facebook┬а(https://www.facebook.com/industrialpunch)┬аand Twitter┬а(https://twitter.com/IndustrialPunch)┬аfor updates on social mediaтАж

  • Website Designing