A review meeting of the M&S Department of Eastern Coalfields Limited was held in the presence of Director (Technical–Operations) and Director (Technical–Projects & Planning) to assess performance and chart future strategies.
The occasion was marked by a historic milestone the highest ever single-day coal dispatch of 90 rakes (75 IR & 15 MGR), totaling 3.34 lakh tonnes on 31st March 2026.
This achievement reflects the strong coordination, operational efficiency, and dedication of Team ECL in driving excellence across dispatch operations. The meeting concluded with a celebratory gathering at Dishergarh Club, recognising this significant success.









